Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering 2001 No.8GPGP COORDINATION MECHANISMS APPLICATION IN SHOP-FLOOR SCHEDULING SYSTEMS BASED ON MAS

GPGP COORDINATION MECHANISMS APPLICATION IN SHOP-FLOOR SCHEDULING SYSTEMS BASED ON MAS


Zeng Bo  Yang Jianjun

(Beijing University of Aeromautics and Astronautics)

 

Abstract: CNP is widely used in manufacturing systems based MAS (multi agent system) to solve scheduling and controlling problems. However, it has aeveral defects in solving real problems. A new method denling with task distributing and scheduling is presented and that is CNP combined with GPGP and TAEMS, and uses it in MM- MES, a manufacturing execution system based MAS, to research distributed manufacturing system’s scheduling and coordination.

Key words: MAS  Contract net protocol  GPGP  TAEMS  Shop floor scheduling
CLC No: TH165
国家863基金资助项目. Received 20001220, received in revised form 20010220

 

Open or Download Full Text of this Paper (PDF File)
 
  About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement  

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved