|
Abstract: The characteristics of project management and the
significance of project dissolution and schedule in virtual enterprise (VE)
environment are analyzed. Combine with the function of project reference
library in VE dissolution, an efficiently project dissolution method
which adapt to the management of VE is presented. A project schedule
method that considers the cost objective of earliness and tardiness as
the penalties based on delivery date is suggested to reflect the
contemporary production idea. In the end, a process frame method is
proposed to solve the distributing and concentrated control problem of
task in VE environment.
Key words: Virtual
enterprise Project management Project dissolution Schedule
CLC No: TH16
国家863计划资助项目(2001AA414240). Received 20010920, received in revised form
20020216 |