  HomeContents of Chinese Journal of Mechanical Engineering 2003 No.4WELDING FOR THE SHELL OF f 3800 LURGI PRESSURIZED GASIFIER

WELDING FOR THE SHELL OF f 3800

LURGI PRESSURIZED GASIFIER

 

Chi Yongjun

(Harbin Boiler Works Company Ltd)

 

Abstract: The welding procedure specification and the concerned requirement for the shell of f 3 800 mm  pressurized gasifier with the advanced -MARK# Ⅳ/4  type is introduced . The test plan is to be determined based on the construction characters. On the basis of test the plan is proven according to the difficulty points in the producing process and find the suitable technology in the manufacturing. While the scientific

reasonable welding procedure plan, assure quality of the product and control the deformation caused by the welding by means of a series of technology , narrow gap automatic tracing bead welding is adopted for the longitudinal and girth welding of the shell. The most difficult points  are solved  for welding the shell of large pressurized gasifier such as assuring the welding quality and controlling the deformation caused by welding, the welding result is satisfied. The success for this term study, valuable experience is accumulated for manufacturing large fatigue vessel and high temperature high pressure mechanical driving equipment.

Key words: Gasifier Shell  Welding procedure specification  Quality control  Product application

CLC No: TG441

国家科委计划编号(973190102). Received 20020114, received in revised form 20020422

  

Open or Download Full Text of this Paper (PDF File)
 
  About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement  

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved