|
Abstract: There is a lack of distributed coordination mechanism for
semiconductor fabrication line scheduling and control status in quo. To
resolve this problem, a multi-agent model for short-term global
scheduling of semiconductor fabrication line is proposed, and a
combination auction based coordination mechanism for multi-object
short-term scheduling is given. An illustrative example of a 152 mm
semiconductor fabrication line in shanghai demonstrates effectiveness of
the approach.
Key words: Semiconductor fabrication line Short term scheduling
Combination auction
CLC No: TH166
国家自然科学基金资助项目(50375097,50375098). Received 20031107, received in revised
form 20040318
|