|
FUZZY NEURAL
NETWORKS BASED RESCHEDULING STRATEGIES OPTIMIZATION OF SEMICONDUCTOR
FABRICATION LINE
Zhang Jie Zhai Wenbin Yan Juanqi
Ma Dengzhe
(Institute of Computer Integrated
Manufacturing, Shanghai Jiaotong University, Shanghai 200030)
|
|
Abstract: For the lack of rescheduling optimization approach for
semiconductor fabrication line status in quo, a novel fuzzy neural
networks based algorithm for rescheduling strategies optimization of
semiconductor fabrication line is proposed. The rescheduling strategies
are divided into line layer, machine group layer and machine layer. The
samples for FNN are setup by simulation evaluation. The relation between
the input of FNN, such as disturbance, system state parameters, and
output of FNN, optimal rescheduling strategy, is built by FNN. With an
illustrative example of a 152 mm semiconductor fabrication line in
shanghai, the lineal regression between FNN output and targets
demonstrates the effectiveness of the approach.
Key words: Semiconductor fabrication line Rescheduling Fuzzy
neural networks
CLC No: TH166
国家自然科学基金资助项目(50375098).
Received 20041112, received in revised form 20050329
|