Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering 2005 No.3RESEARCH ON ETAEMS/GPGP-CN BASED DYNAMIC SCHEDULING TECHNOLOGY OF SEMICONDUCTOR FABRICATION LINE

RESEARCH ON ETAEMS/GPGP-CN BASED DYNAMIC SCHEDULING TECHNOLOGY OF SEMICONDUCTOR FABRICATION LINE

 

Zhai Wenbin  Zhang Jie  Yan Juanqi  Ma Dengzhe

(Institute of Computer Integrated Manufacturing, Shanghai Jiaotong University, Shanghai 200030)

 

Abstract: There is a lack of distributed coordination mechanism for semiconductor fabrication line dynamic scheduling status in quo. To resolve this problem, a novel modeling and scheduling technology, ETAEMS/GPGP-CN, for dynamic scheduling of semiconductor fabrication line is proposed. To extend the non-local effect of TAEMS, ETAEMS can be used to quantitatively model and analyze the coordination relationship. Integrating the GPGP for upstream or downstream coordination information and contract net, GPGP-CN algorithm for dynamic scheduling is given. An illustrative example of a 150 mm semiconductor fabrication line in shanghai demonstrates the effectiveness of approach.

Key words: Semiconductor fabrication line  Dynamic scheduling  Distributed coordination  Multi-agent

CLC No: TH166

国家自然科学基金资助项目(50375098). Received 20040415, received in revised form 20040915

 
Open or Download Full Text of this Paper (PDF File)
 
  About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement  

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved