Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering 2007 No.6PRODUCT COST ESTIMATION MODEL IN EARLY DESIGN PHASE BASED ON COST CLUSTER

PRODUCT COST ESTIMATION MODEL

IN EARLY DESIGN PHASE BASED

ON COST CLUSTER

 

JIANG Shaofei1  LU Congda1  LU Chunfu1  PAN Shuangxia2

(1. Key Laboratory for Mechanical Manufacture & Automation of Ministry of Education,
Zhejiang University of Technology, Hangzhou 310032;
2. State Key Laboratory of CAD&CG, Zhejiang University, Hangzhou 310027 )

 

Abstract: A cost estimation model based on cost cluster is presented with big samples in early product design phase because precise cost estimation in early adptive or derivative product design phase is very difficult. Euclidean distance between samples and estimating product are calculated to express their similarity. Difference matrix, distance matrix and similarity matrix are built base on euclidean distance sets between samples and indeterminate estimation product, then most correlated sample sets are selected to get interval of estimated cost based on cost cluster analysis. An example of brake disc shows invalidity of the cost cluster model. The result of experiment proved that cost cluster model was able to separate relative order of qulity of the samples.

Key words: Cost cluster Cost interval Euclidean distance Gray fuzzy cluster

CLC No: TH166

浙江省自然科学基金(Y105207)和国家自然科学基金(50305034)资助项目. Received 20060822, received in revised form 20061226

 
Open or Download Full Text of this Paper (PDF File)
 
  About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement  

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved