Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering (English Edition),2002 No.2FAILURE ASSESSMENT OF DEFECTIVE GATHERING TUBE UNDER HIGH PRESSURE
FAILURE ASSESSMENT OF DEFECTIVE GATHERING
TUBE UNDER HIGH PRESSURE*

 

Zhang Wenge  Li Jianrong  Yu Jilin

Key Laboratory of Mechanical Behavior and Design of Materials,

University of Science and Technology of China, CAS, Hefei 230027, China

Chen Xuedong  Zhang Haibo  Wang Bing

 Hefei General Machinery Research Institute

 

Abstract:  A numerical model on stress assessment of a defective elliptic gathering tube used in the heat recovery boiler of a pyrolyzer is built up. The effect of local defects on the carrying capacity of the tube is analyzed by using the MSC/NASTRAN finite element code, and the critical size of defects is obtained. Then, two numerical models of damaged tube with local and integral reinforcements, respectively, are also calculated. Stress classification and assessments are provided by applying the ASME and JB47321995 standard. Some guidance and suggestions about the tube reinforcements and the prediction of the remaining life of the structure for engineering practice are discussed.

Key words: Gathering tube  Heat recovery boiler  Initial damage  Failure assessment  Numerical simulation


* This project is supported by Foundation of Yangzi Petrochemical Ltd. and Chinese Academy of Science (No. KJ95-1-201). Selected from Proceedings of 2000 the First International Conference on Mechanical Engineering; revised manuscript June 6, 2001

 

Open or Download Full Text of this Paper (PDF File)

About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved