Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering (English Edition),2002 No.3INTEGRATED APPROACH TO GENERATION OF PRECEDENCE RELATIONS AND PRECEDENCE GRAPHS FOR ASSEMBLY SEQUENCE PLANNING
INTEGRATED APPROACH TO GENERATION OF PRECEDENCE RELATIONS AND PRECE-

DENCE GRAPHS FOR ASSEMBLY 

SEQUENCE PLANNING*

 

Niu Xinwen  Ding Han  Xiong Youlun

School of Mechanical Science and Engineering, Huazhong University of Science and Technology,

Wuhan 430074, China

 

Abstract:  An integrated approach to generation of precedence relations and precedence graphs for assembly sequence planning is presented, which contains more assembly flexibility. The approach involves two stages. Based on the assembly model, the components in the assembly can be divided into partially constrained components and completely constrained components in the first stage, and then geometric precedence relation for every component is generated automatically. According to the result of the first stage, the second stage determines and constructs all precedence graphs. The algorithms of these two stages proposed are verified by two assembly examples.

Key words: Assembly sequence planning  Assembly flexibility  Precedence relations  Precedence graphs


* This project is supported by National Natural Science Foundation of China (No.59990470, No.59725514, No.59985004) and Robotics Laboratory, Chinese Academy of Sciences Foundation (No.RL200006). Received July 3, 2001; received in revised form November 4, 2001; accepted April 1, 2002

 

Open or Download Full Text of this Paper (PDF File)

About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved