Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering (English Edition),2003 No.4Noise Reduction scheduling Method in A Shop floor and Its Case Study

Liu Fei

 

Cao Huajun 

Institute of Manufacturing Engineering,

Chongqing University,

Chongqing 400044, China

Zhang Hua
Institute of Manufacturing Engineering, Wuhan University of Science
and Technology,

Wuhan 430081, China

Yuan Chuanping

Institute of Manufacturing Engineering,

  Chongqing University,

Chongqing 400044, China

 

 

Noise Reduction scheduling Method in A Shop floor and Its Case Study*


Abstract: Noise reduction in a shop floor is one of the important parts of green manufacturing. In a shop floor, machine tools are the main noise sources in a shop floor. A new approach is discovered by investigation that the noise can be obviously reduced in a shop floor by optimizing the scheduling between work pieces and machine tools. Based on the discovery, a new method of noise reduction is proposed. A noise reduction scheduling model in a shop floor is established, and the application of the model is also discussed. A case is studied, which shows that the method and model are practical.

Key words: Green manufacturing  Noise reduction  Scheduling

 


* This project is supported by National 863 project, China (No.2001AA412200). Received January 20, 2003; received in revised form June 13, 2003; accepted June 26, 2003

 

Open or Download Full Text of this Paper (PDF File)

About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved