MODIFIED BOTTLENECK-BASED PROCEDURE FOR LARGE-SCALE FLOW-SHOP SCHEDULING PROBLEMS WITH BOTTLENECK*

 

Abstract: A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems.

Key words: Flow-shop scheduling problem  Heuristic  Bottleneck machine

 


*This project is supported by National Natural Science Foundation of China (No.60274013, No.60474002) and Shanghai City Development Found for Science and Technology, China (No.04DZ11008). Received November 15, 2005; received in revised form May 30, 2006; accepted June 8, 2006

 

Open or Download Full Text of this Paper (PDF File)

About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved