Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering (English Edition),2007 No.4DYNAMIC ADVANCED PLANNING AND SCHEDULING WITH FROZEN INTERVAL FOR NEW ORDERS

CHEN Kejia

JI Ping
Department of Industrial and Systems Engineering,
The Hong Kong Polytechnic University, Hong Kong, China

 

 

DYNAMIC ADVANCED PLANNING AND SCHEDULING WITH FROZEN INTERVAL FOR NEW ORDERS* 

 

Abstract: A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency.

Key words: Dynamic advanced planning and scheduling Genetic algorithm Frozen interval

 


* This project is supported by the Hong Kong Polytechnic University, China (No.G-RGF9). Received August 7, 2006; received in revised form November 14, 2006; accepted December 7, 2006

 

Open or Download Full Text of this Paper (PDF File)

About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved