Home|News|Literature|Journal|Instruction|Forum|Member|Introduction

Chinese  Old version

By    In    Search 

  HomeContents of Chinese Journal of Mechanical Engineering (English Edition),2007 No.5HEURISTIC MODELING FOR A DYNAMIC AND GOAL PROGRAMMING IN PRODUCTION PLANNING OF CONTINUOUS MANUFACTURING SYSTEMS

JAHAN A

ABDOLSHAH M
Department of Industrial Engineering, Islamic Azad University-Semnan branch, Semnan, Iran

 

 

HEURISTIC MODELING FOR A DYNAMIC AND GOAL PROGRAMMING IN PRODUCTION PLANNING OF CONTINUOUS MANUFACTURING SYSTEMS 

 

Abstract: At the first sight it seems that advanced operation research is not used enough in continuous production systems as comparison with mass production, batch production and job shop systems, but really in a comprehensive evaluation the advanced operation research techniques can be used in continuous production systems in developing countries very widely, because of initial inadequate plant layout, stage by stage development of production lines, the purchase of second hand machineries from various countries, plurality of customers. A case of production system planning is proposed for a chemical company in which the above mentioned conditions are almost presented. The goals and constraints in this issue are as follows: ① Minimizing deviation of customer’s requirements. ② Maximizing the profit. ③ Minimizing the frequencies of changes in formula production. ④ Minimizing the inventory of final products. ⑤ Balancing the production sections with regard to rate in production. ⑥ Limitation in inventory of raw material. The present situation is in such a way that various techniques such as goal programming, linear programming and dynamic programming can be used. But dynamic production programming issues are divided into two categories, at first one with limitation in production capacity and another with unlimited production capacity. For the first category, a systematic and acceptable solution has not been presented yet. Therefore an innovative method is used to convert the dynamic situation to a zero- one model. At last this issue is changed to a goal programming model with non-linear limitations with the use of GRG algorithm and that’s how it is solved.

Key words: Heuristic model  Dynamic programming  Goal programming production planning

 


Received September 7, 2006; accepted November 10, 2006

 

Open or Download Full Text of this Paper (PDF File)

About us-Contact us-Site map-Advertisement service-Cooperation-Legal statement

Address: 22 Baiwanzhuang Dajie, Beijing 100037 China    Tel: 8610-88379907    Fax: 8610-68994557

E-mail: cjme@mail.machineinfo.gov.cn  http: //www.cjmenet.com
©2006 Editorial Office of CJME. All Right Reserved