|
Biographical notes
ZHAO Bo is currently a PhD candidate in School of Mechanical and
Vehicular Engineering, Beijing Institute of Technology, China. His
research project includes process integration and collaborative work in
product development.
Tel: +86-10-68946457; E-mail: zhaobo@bit.edu.cn
YAN Yan is currently a professor in Beijing Institute of Technology,
China. She received her PhD degree from Beijing Institute of Technology,
China, in 2001. Her research interests include CAD/CAPP/CAM/CIMS, etc.
Tel: +86-10-68912718; E-mail: yanyan331@bit.edu.cn
NING Ruxin is currently a professor in Beijing Institute of Technology,
China. She received her PhD degree from Berlin Industrial University,
German, in 1986. Her research interests include CAD/CAPP/CAM/CIMS, etc.
Tel: +86-10-68912503; E-mail: rxning@bit.edu.cn
LI Shiyun is a researcher in Shanghai Hudong-zhonghua Shipbuilding
(group) Co., China. He received his PhD degree from Beijing Institute of
Technology, China, in 2006. His research interests include PDM/CIMS,
etc.
Tel: +86-21-58713222-2231; E-mail: l_shiyun@163.com
References
[1] PINTO J K. Project management 2002[J]. Research Technology
Management, 2002, 45(2): 22-37.
[2] ANDERSON D K, MERNA T. Project management strategy - project
management represented as a process based set of management domains and
the consequences for project management strategy[J]. International
Journal of Project Management, 2003, 21(6): 387-393.
[3] KHAN A. Project scope management[J]. Cost Engineering (Morgantown,
West Virginia), 2006, 48(6): 12-16.
[4] GRANT K P, PENNYPACKER J S. Project management maturity: an
assessment of project management capabilities among and between selected
industries [J]. Engineering Management, 2006, 53(1): 59-68.
[5] MOLINA A, ACA J, WRIGHT P. Global collaborative engineering
environment for integrated product development[J]. International Journal
of Computer Integrated Manufacturing, 2005, 18(8): 635-651.
[6] KONG Jianshou, ZHANG Youliang, WANG Huifen. Study on integration of
distributed PM and workflow in collaborative product development
environment[J]. China Mechanical Engineering, 2003, 14(13): 1 122-1 125.
(in Chinese)
[7] XU Jun, YANG Dongchao, LI Shuning. Technologies of collaborative
project management oriented product development[J]. Machinery Design &
Manufacturing, 2004(4): 101-103. (in Chinese)
[8] COMBI C, POZZI G. Task Scheduling for a temporal workflow management
system[C]//Thirteenth International Symposium on Temporal Representation
and Reasoning, 2006, 61-68.
[9] TRAMONTINA G B, WAINER J. Modeling the behavior of dispatching rules
in workflow systems: a statistical approach[C]//Groupware: Design,
Implementation, and Use, 11th International Workshop, CRIWG 2005
Proceedings (Lecture Notes in Computer Science Vol. 3706), 2005,
208-215.
[10] WANG Jiacun, ROSCA D. Dynamic workflow modeling and verification[C]//Advanced
Information Systems Engineering. 18th International Conference, CAiSE
2006 Proceedings (Lecture Notes in Computer Science Vol. 4001), 2006,
303-318.
[11] MA Liang, GU Ming. Role-based access control model for workflow
systems[J]. Mini-Micro Systems, 2006, 27(1): 136-140. (in Chinese)
|